The new generation of Building Supplies Stores dictate a lower percentage of warehouse and a higher percentage of canopy providing for a much higher site utilisation factor overall. In addition the IRS system now favoured amongst smart operators allows for a holistic, value engineered design releasing enormous benefits for store owners. Gone are the days when you had to compromise the shed design because of limitations with spans and generic manufacturers limitations. With IRS we go straight to the ultimate layout then engineer the complete package including Trade Store and Office Facilities. With an overall ‘best practice’ design agreed you then have the option of staging the project or moving ahead with a complete ‘turn key’ solution. We understand the key wining components of a successful Building Supplies operation and work with you to formulate a plan that gains you the business advantage. Walking you through a clear step by step process the logical value achieved with the IRS system will become illuminated making the decision to join the ‘smart operators’ simple.

FAQ

As per the acceptable solution if the IRS building is located more than 15m from legal boundaries no fire rating is required. If the building is positioned on a road boundary the 15m can be measured from the opposite side of the road often negating the need for fire rating on this portion of the build. It is simple for the IRS system to be used where fire rating is required, and the most common method is to utilize concrete tilt panels with the IRS structure sitting inside the tilt panel fire wall.

Yes, offices can be built in/integrated into the super structure of the IRS system.

Yes – the IRS system provides a more cost-effective option to a traditional build methodology when you factor in the additional racking investment. Also utilizes space better as there is no waste space between the building structure and the rack structures. It is normal to have clearance between the structures which is a waste of space, and the IRS system removes this waste space as it combines both structures into one.

Providing the structure is over 30m² the canopy will need a building consent. As the structures are simple in nature it means the consent process is also simple – our team can take care of this process.

The IRS system is modular so the span can be adjusted to suit the exact requirements you need in order to achieve efficiency. Most common spans for timber yards is between 7-10m between the bases however spans of 15m + between the bases have been achieved on completed projects. It is important to note that most spans can be catered for by increasing the size of the portal spanning between the rack structures.

The IRS system is modular so the span can be adjusted to suit the exact requirements you need in order to achieve efficiency. Most common spans for timber yards is between 7-10m between the bases however spans of 15m + between the bases have been achieved on completed projects. It is important to note that most spans can be catered for by increasing the size of the portal spanning between the rack structures.